Archives
Dunsley Slimline SG 5 kW – Stretford
Read MoreThe original surround, hearth and gas fire removed. We did a full knockout to the required size and installed a concrete lintel. A multi fuel liner was installed. A new stone hearth to the front and back of…
Dunsley Slimline SG 5 kW – Widnes
Read MoreOur customer had an electric fire and surround, This was removed. A full knockout and concrete lintel installed. We installed a multi fuel liner with a cherry picker as we were unable to reach the stack due to…
Esse 100 double door – Northwich
Read MoreNo chimney? No problem!! The esse stove was installed on a stone hearth. Twin wall pipe used as a chimney and taken through to the outside and up the side of the house. All powder coated black, and…
Dunsley 3kw – Northenden
Read MoreThis was one of two stoves installed in this customers house. They had recently moved in and had always wanted a wood burner! So they got two!! This particular one was installed in the “Snug” a small room…
Aga Wren – Nantwich
Read MoreWe opened up the chamber and removed the plaster board and skirting board from the chamber, swept the chimney and installed a multi fuel liner. Our customer wanted an oak beam. This was bespoke made to their requirements….
Dovre 425 MF – Wilmslow
Read MoreOur customer contacted us as they had a stove fitted, but didn’t think it was correctly installed, and they were right! This stove was illegally fitted and did not comply to any Hetas regulations. We took the stove…
Esse 500se – Lymm
Read MoreWe removed the gas fire, had the gas cut and capped off. Opened up the chamber and installed a concrete lintel. The chimney was swept and a multi fuel liner was installed. We built a reclaimed Cheshire brick…
Beltane Chew – Sale
Read MoreAn original gas fire was removed with the surround hearth and back panel. We opened up the chamber and installed a concrete lintel. Relined the chimney with a 904 multi fuel liner. Inside the chamber we installed fire…
Mendip Churchill – installed in Sale
Read MoreOur customer had nothing only a hole that was plaster boarded. We removed all the plaster board, swept the chimney, opened up the chamber and installed a concrete lintel. The chimney was lined with a 904 multi fuel…











