RIVA F670 BALANCED FLUE GAS STOVE – INSTALLED IN HALE
Our customer had a hole in the wall and wanted a gas stove installed. He chose the balanced flue option. We removed the shelving in the chamber and opened it up the to correct size. We had to rebuild the brickwork as the original house only had a wood lintel to hold the brickwork up. We installed a concrete lintel to support the brickwork above and rebuilt the chimney. A new gas supply was installed as there was no gas to the chamber. Inside the chamber we installed fireboard and a new steel register plate. A granite hearth was installed to the front and back of the chamber. We then installed the Riva F670 balanced flue gas stove and our Gas engineer connected it all up. Our plasterer then followed after to skim the whole chimney breast. Fabulous transformation!